TEXTURE PAINT
Tool for Texture Paint: Scraper Environment condition: 5℃-40℃, less than 85% RH. No application in bad weather Base render facade: Must be firm,clean,and level. Water content<10% PH value<10%. Good putty needed if the facade does not meet requirement. Storage: Sealed in cool and dry place 5℃-35℃. Shelf time: 12 Months. Tips: No dilution needed. Not to mix different batches paint for one big area wall to avoid color difference. |
Texture Paint Application Guide
No. | Procedure | Product | Dosage | Processing time | Dry time | Recoat time | Tools | Note |
1 | Substrate treatment | Putty series | 1.5-3.0kg/㎡ (2mm DFT) | 2-3times | Dry to touch: 2h Dry hard: 48h(25℃) | ≥4H | Scraper | Make the base solid , smooth, dry and clean |
2 | Primer coat | Water base Damp-proof primer/ Water base sealing primer | 0.1-0.2kg/㎡ | 1-2times | Dry to touch: 1h Dry hard: 12h(25℃) | ≥1H | Wool Brush/ roller /sprayer | Seal the Substrate, alkali resistance, penetration resistance |
3 | Texture Paint | Texture paint | 1.5-3.5kg/㎡ (2mm DFT) | 2-3times | Dry to touch: 2h Dry hard: 48h(25℃) | ≥24H | Special sprayer/Roller /Scraper | Protect the paint from water after applying. |
4 | Top coat | Water base Waterproof and weather-resistant finish/ Water base dustproof finish | 0.15-0.3kg/㎡ | 1-2times | Dry to touch: 1h Dry hard: 24h(25℃) | ≥1H | Wool Brush/ roller /sprayer | Polish sharp sands or angle before spraying top coat if necessary. |